Synlogica Book a call

Contents

  1. The short answer
  2. Who decides — and who doesn't
  3. The evidence a decision needs
  4. Why the technical agreement matters
  5. Why speed is a quality issue, not just a logistics one
  6. FAQ
  7. References

1. The short answer

When a temperature excursion happens in transit, the quality decision — release, quarantine or reject — belongs to the Marketing Authorisation Holder and its Qualified Person (QP), assessed against the product's stability data. The carrier or 3PL is responsible for maintaining conditions and reporting the deviation, but not for deciding disposition. Confusing those two roles is where excursions go wrong.

Bottom lineThe carrier owns the transport controls and the report; the QP owns the decision. Both are written into the quality/technical agreement. An excursion is a shared event with a single, clearly-owned decision.

2. Who decides — and who doesn't

Under EU GDP, the wholesale distributor must maintain the required conditions during transport and immediately flag any deviation. But the disposition decision is a GMP/quality act reserved for the authorised person. A logistics provider — however capable — can quarantine and escalate; it cannot release. This split exists because releasing a batch requires access to, and judgement over, the product's stability data and marketing authorisation, which sit with the MAH, not the carrier.

3. The evidence a decision needs

A defensible transit-excursion disposition rests on the same evidence set as any excursion decision:

"The average was in range" is not evidence — it can hide a brief but disqualifying spike or freeze. The profile, against the product's kinetics, is the assessment.

4. Why the technical agreement matters

The quality/technical agreement between the MAH and the carrier is where the roles are made explicit: who monitors, who reports and how fast, who quarantines, and who decides. When an excursion happens and this is vague, hours are lost arguing about responsibility while the product sits in an uncertain state. A clear agreement turns an excursion from a scramble into a defined procedure.

5. Why speed is a quality issue, not just a logistics one

Every hour a batch spends in quarantine awaiting a disposition is cost, risk and sometimes further exposure. Yet rushing to release without the stability evidence is the worse failure. The resolution is not to decide faster by cutting corners, but to make the evidence assembly faster: reconstruct the profile, pull the relevant stability data, compute the impact, and present a complete, signed package — so the QP's decision is quick because the evidence is ready, not because it was skipped.

That is what Synlogica Terminus (Terminus M4, Quality) is built to do: it turns the logger file into a sealed, reproducible decision package — profile, stability comparison, stated confidence — in under a minute, and leaves the binding release call to the QP. The full anatomy of that package is in the excursion decision package white paper.

6. FAQ

Who is responsible for a temperature excursion in transit — the carrier or the MAH?

Accountability for the quality decision stays with the MAH and its QP; the carrier maintains conditions and reports deviations under the technical agreement. The QP decides disposition; the carrier owns the transport controls.

Can a wholesaler or 3PL release the product after an excursion?

No. A logistics provider can quarantine and report, but the release/reject disposition is a quality decision for the authorised person (QP). The technical agreement should make that split explicit.

What evidence is needed to release a batch after a transit excursion?

The actual logger trace (with calibration status), the registered storage condition and the delta, the stability data cited specifically, and a signed, dated disposition with rationale (ALCOA+) — reproducible by another reviewer.

7. References